Fault or plant downtime
Systematic analysis of the PLC program, inputs and outputs, communication, drives and machine sequence – remotely or directly at the plant.
We extend, analyze and modernize control systems in existing machines and industrial plants – prepared remotely, commissioned on site and documented clearly.
20+ years of experience · S7-300/400/1200/1500 · TIA Portal & STEP 7 · Austria and DACH
Systematic analysis of the PLC program, inputs and outputs, communication, drives and machine sequence – remotely or directly at the plant.
New sequences, operating modes, interfaces and diagnostic functions integrated into the existing program structure.
Phased modernization of S5, S7-300 and S7-400 plants to current Siemens systems, scheduled around existing maintenance windows.
I/O checks, signal tests, sequence verification, corrections and acceptance for new, converted and extended systems.
S7 Retrofit
Not every older controller needs to be replaced immediately. We review the program version, hardware, connected peripherals, documentation and available maintenance windows. This produces a clear migration path – from targeted continued operation to phased modernization of individual plant sections.
Programming, extension and maintenance of SIMATIC controllers for machines, production lines and existing industrial plants.
Operator interfaces and plant visualization for machine operation, diagnostics and ongoing production.
Structured support for commissioning, troubleshooting and changes during ongoing plant operation.
Provide machine data and control signals in a structured form for visualization, MES, monitoring and IT systems.
Sync Motion is based in Deutschlandsberg and supports industrial customers in Austria as well as selected projects in Germany and Switzerland. Many engineering tasks can be prepared remotely. Commissioning, signal tests and acceptance take place directly at the plant when required.
You describe the controller, plant, fault, required change and available time window.
We review project versions, documentation, interfaces, access and technical prerequisites.
You receive a clearly defined scope covering effort, schedule, prerequisites and responsibilities.
Programming, preparation, commissioning, function testing and technical documentation.

CTO at Sync Motion
Deutschlandsberg, Styria, Austria
20+
years in automation
100+
projects delivered
S5 → S7
migration & retrofit
Harald Brida has programmed and modernized control and automation systems for more than 20 years – from individual machines to complex industrial plants. His focus is Siemens S7, TIA Portal, STEP 7 Classic, commissioning and the phased modernization of existing plants.
Programs are structured so that sequences, interlocks and interfaces remain understandable later. For retrofit projects, as much work as possible is prepared remotely and scheduled into existing maintenance windows.
FAQ
Costs depend on the controller, project status, documentation, access options, required scope and necessary on-site work. After a short technical clarification, you receive a clearly defined scope with effort and prerequisites.
The focus is on SIMATIC S7-300, S7-400, S7-1200 and S7-1500 as well as TIA Portal and STEP 7 Classic. For visualization, we support WinCC, WinCC Unified and Siemens panels, among others.
Yes. Engineering and preparation can often be done remotely. Signal tests, function tests, commissioning and acceptance are carried out directly at the plant when required.
Yes, provided the existing program version and technical access allow a structured analysis. At the outset, project versions, I/O, communication and plant behavior are recorded. This determines the scope for troubleshooting, documentation or modernization.
Migration should be reviewed when spare-parts risk, missing project versions, extension requirements, outdated visualization or recurring faults make plant operation difficult. A full replacement is not always necessary; modernization can often be planned in clear stages.
Program reviews, software changes, block preparation, HMI adjustments, project comparisons and parts of diagnostics can often be performed remotely. Work on signals, hardware, drives and real machine sequences generally requires on-site support.
Yes. Sync Motion supports selected projects in Germany and Switzerland and other international assignments where required. Scope and on-site work are agreed before the project begins.
Yes. We can take on clearly defined engineering, visualization, commissioning or retrofit work packages and integrate into existing project structures.
Describe the controller, plant, required change or fault. We will check what information is still needed for a sound assessment.
Discuss a PLC projectUseful details include controller type, TIA or STEP 7 version, available project version, plant location and required time window.